The troubles of bicycle frame manufacturing enterprises
1.After the frame is welded, the verification process of its size, shape and Angle is a time-consuming, laborious and costly task.
2. The work flow is commonly the following steps: design (or update the drawing version) - drawing issued print -- -- -- -- -- -- -- -- -- -- -- keep the drawing and fitted with a transparent protective sleeve -- -- -- -- -- drawings for -- -- -- -- -- than drawing diagram (or called nuclear figure) - keeping recycling.
3. For medium-sized annual production capacity frame manufacturing enterprises, if the new issuance and supplementary printing volume of drawings is 10,000 pieces per year, with a cost of 20 yuan per drawing, the cost of drawing materials is 200,000 yuan. The drawing storage workshop is approximately 200 square meters. Calculated at 23 yuan per square meter, the factory rent is 55,000 yuan per year. The salary cost for the staff involved in the printing, distribution and storage of gold drawings is about 6,000 yuan *2 people = 144,000 yuan per year. The actual direct cost of the nuclear map each year is at least 394,000 yuan.



Solution to the problem ----1:1 Comparison display
Features of 1:1 scale display:
1. Independently develop dedicated 1:1 software;
2. Different sizes of displays can be configured according to different workstations and different-sized bracket components. 3.3 The drawings are retrieved from the company's public network disk without the need for format conversion by external companies. The client's drawings are kept confidential :3.4. The countertop is made of tempered glass, which is impact-resistant and violent.
3. The software adopts an offline version to prevent employees from operating things unrelated to work.
4. The graphic comparison software ADAPTS to CAD format and does not require additional conversion, making it easy for employees to operate. 3.7. How large is the display area of the monitor? How large can the 1:1 display drawing be shown? The menu display does not occupy the display area, ensuring the maximum utilization rate of the display area. 3.8. The drawings can be freely rotated to make the most effective use of the display area of the monitor


